Backflow testing requirements in Willington, Connecticut
Start with the verified utility guides and state water-system records below. The responsible utility—not the town name alone—sets the property's accepted form, testing schedule, and submission route.
Best available local guidance
Utility guides associated with Willington
Connecticut DPH inventory
Public water systems listing Willington
These systems list Willingtonas their principal municipality in the active DPH inventory. This is a discovery aid, not proof that a particular address is inside a system's service boundary.
Woodhaven Apartments
PWS ID CT1600031 · groundwater
489 population listed
131 service connections
Willington Senior Center & Housing
PWS ID CT1609141 · groundwater
327 population listed
1 service connections
Walden Apartments
PWS ID CT1600041 · groundwater
276 population listed
110 service connections
CTWC - Riversedge Division
PWS ID CT1609111 · GWP
179 population listed
49 service connections
Deer Park Apartments
PWS ID CT1600071 · groundwater
125 population listed
45 service connections
Willington Ridge Condos - System #1
PWS ID CT1606111 · groundwater
102 population listed
11 service connections
Willington Ridge Condos - System #2
PWS ID CT1606211 · groundwater
102 population listed
23 service connections
Ridgeview Heights
PWS ID CT1600051 · groundwater
96 population listed
48 service connections
North Willington Village Condo Assoc.
PWS ID CT1600061 · groundwater
66 population listed
27 service connections
Natural Park Apartments
PWS ID CT1600101 · groundwater
60 population listed
20 service connections
5
Non-transient, non-community systems
13
Transient non-community systems
How to verify an address
Use the source trail before relying on a filing route
- 1
Identify the water provider from the property’s water bill, DPH inventory, or the state Exclusive Service Area map.
- 2
Open the utility guide when available and check its review date, testing cadence, accepted form, and submission method.
- 3
Confirm property-specific requirements with the utility before the appointment; hazards, device type, and deadlines can differ.
For testing companies
Keep every customer, assembly, and due date in one place.
Import your existing customer book and keep utility guidance attached to the work.
